Big enough to handle, small enough to care. 15+ years' experience · Fully insuredWhatsApp +44 7999 538377
Call us020 8123 7717 Get a free quote

Moving guide

Office moving guide

A well-run office move is mostly planning. This guide sets out the timeline we use with clients, from the decision to move to the first morning in the new building.

Three months before

  • Appoint one person inside the business to run the move and make decisions.
  • Check your current lease for notice periods and reinstatement (dilapidations) obligations.
  • Get a floor plan of the new office and decide who sits where.
  • Ask your IT provider to plan network, phones and broadband at the new site; lead times can be long.
  • Get quotes from removal companies, each based on a site visit.

One to two months before

  • Decide what furniture moves, what is sold or recycled, and what new furniture arrives.
  • Book the move date, usually a Friday evening or weekend.
  • Ask both buildings what they need: lift bookings, loading bay slots, risk assessments and method statements.
  • Order new stationery and update your website, Google Business Profile and directories with the new address.

Two weeks before

  • Number every desk on the new floor plan and give each person their label set.
  • Have crates delivered so staff can pack their own desks.
  • Clear out archive boxes and arrange confidential shredding for anything you no longer need.
  • Confirm parking or loading arrangements at both buildings.

Moving day

  • Staff pack desks and label crates by desk number before leaving on the last day.
  • Monitors and PCs are wrapped and moved with their desks.
  • Furniture is dismantled, moved and rebuilt to the floor plan.
  • IT reconnects network, phones and printers.
  • The move manager walks the floor with your lead before the crew leaves.

The first week

  • Collect empty crates.
  • Fix any snagging: desk heights, cable management, missing keys.
  • Redirect post and check suppliers have your new delivery address.
  • Arrange clearance of anything left at the old office before handover.

Frequently asked questions

How long does an office move take?

Most small and medium offices move in one evening or a weekend. Larger offices may move floor by floor.

Who reconnects the IT?

Your IT provider should reconnect networks, servers and phones. Removers pack, move and place the equipment.

Do we need to empty the old office completely?

Usually yes, depending on your lease. Plan clearance before your handover date.

Free removal quote

Ready to move? Tell us about it.

Answer a few quick questions and we reply with a written, itemised quote. Prefer to talk or send a video? We are here.

  • Free, no obligation
  • Fully insured, professional crews
  • Man and van from £49/hr, fixed-price quotes available

Get a free quote

Free, no obligation

Step 1 of 4

Step 1: Your move
Type of move *
More move types
* required
Step 2: Size of the move
How big is the move? *
Step 3: The properties

Moving from

What type of property? *

Moving to

What type of property? *
Step 4: Anything extra?
Tap any that apply (you can skip this)
Special items (piano, antiques, safe...)
Tap any that apply
Flexible dates can lower the price on longer routes. See part loads. The price is always confirmed in your written quote.
Is the move linked to a sale, purchase or rental? (optional)
Do the keys have to be handed over by a set time? (optional)
Add a rough list of what is moving
Step 5: Your details
How should we contact you?

By sending this you agree that we may contact you about it. We use your details only for this quote and never sell them. Privacy policy

Get a free quote